Aenean sodales pretium nullam
February 3, 2017CET Power commissions 5.48MW Plant in Lagos University Teaching Hospital (LUTH)
December 7, 2017
POWER GENERATION AND ENERGY SALES
CET Power provides out-sourced power to organizations with industrial-scale operations either on a short-term (EPP) basis, or on long-term (IPP) arrangements. Upon negotiated request, CET Power deploys its power generation equipment to the Client’s sites/premises. The equipment are manned by a highly professional crew and are able to generate and supply reliable power to the client on a round-the-clock (24/7) basis, with reference to the contractual capacity (MW) and duration (Months or Years).
CET Power is able to tailor its power plant configuration to clients’ specific requirements, and thereby avails the client the opportunity to tap into the many benefits of outsourced power generation.
Our Value Proposition
Optimal mix of power generation technologies
Natural gas, diesel, HFO, Solar hybrids etc
Speedy delivery
CET Power’s fleet of power generation equipment is currently the largest in Nigeria, and therefore, enables the unrivalled ability to deliver power at very short notice – typically within 10 – 90 days of execution of a Power Purchase Agreement (PPA)
Seamless transition from EPP to IPP and vice versa
The modular nature of CET Power’s plant configuration makes for rapid increases in capacity within a short period of time and a smooth and quick transition from the initial EPP model to a more permanent IPP.
Reduced financial strain
Client is spared the financial strain of “Owning & Maintaining” a power plant, which would constitute a significant capital investment on the part of the client
Get in touch Today
+234 (0810 245 4945) | +234 ( 0803 311 5468)